-
You start by creating a regular item and linking a "production BOM" (bill of materials) to it, and optionally setting up a routing on the item card.
- Under replenishment, remember to set the replenishment system to either production order, purchase, or assembly, depending on what it should be.
- Under planning, the "include in hierarchy" field must be checked, as previously mentioned. Explanation: This indicates that it should be included as part of a comprehensive hierarchy, either in an assembly or production order, and be able to trace subcomponents up through the hierarchy.
- Set up these mandatory details regarding posting setup:
- Once that is done, you are ready to create your first sales order or quote and add your production order to the lines, then calculate using the sales configurator
Comments
0 comments
Please sign in to leave a comment.